Project Scheduler

NORTH RICHLAND HILLS, TX
Full Time
DFW
Experienced


Location: North Richland Hills, TX

Heavy Civil Construction Scheduler

Position Summary
Scheduler will be responsible for developing, maintaining, and analyzing project schedules for highway, bridge, roadway, and other heavy civil infrastructure projects. This position will work closely with project management, field operations, owners, subcontractors, and engineers to ensure projects are planned, monitored, and completed on schedule. The Scheduler will utilize Primavera P6 to develop baseline schedules, update progress, identify critical path impacts, evaluate delays, and support change orders and Time Impact Analyses (TIA).

Duties & Responsibilities
  • Develop detailed baseline CPM schedules using Primavera P6 for heavy civil construction projects.
  • Prepare resource-loaded and cost-loaded schedules when required.
  • Maintain and update project schedules on a weekly and monthly basis.
  • Perform Critical Path Method (CPM) analysis and identify schedule risks.
  • Monitor project progress and compare actual performance against the baseline schedule.
  • Coordinate with Project Managers, Superintendents, Engineers, Estimators, and Subcontractors to obtain schedule updates.
  • Prepare schedule narratives describing project status, progress, critical activities, and recovery plans.
  • Identify schedule delays and analyze impacts to project completion.
  • Develop recovery schedules and acceleration plans when required.
  • Perform Time Impact Analyses (TIA) and forensic schedule analysis for delay claims.
  • Analyze owner-caused, contractor-caused, utility, weather, and third-party delays.
  • Prepare schedule exhibits for change orders, claims, and dispute resolution.
  • Review subcontractor schedules for compliance with contract requirements.
  • Assist estimating teams during bid phase with schedule development and phasing plans.
  • Coordinate schedule logic with traffic control phasing, utility relocations, environmental restrictions, and permit requirements.
  • Track project milestones, float consumption, near-critical activities, and schedule performance metrics.
  • Participate in project planning meetings, progress meetings, and owner schedule reviews.
  • Ensure schedules comply with contract specifications including TXDOT scheduling requirements.
  • Support management with executive-level schedule reporting and dashboard development.
  • Maintain historical schedule documentation and schedule revisions throughout the life of the project.
  • Assist with preparation of extension of time requests and contract modifications.
  • Collaborate with field personnel to verify production rates and sequencing of work activities.
  • Develop look-ahead schedules ranging from two to six weeks for field operations.

Required Skills & Abilities
  • Advanced proficiency in Primavera P6.
  • Strong understanding of Critical Path Method (CPM) scheduling.
  • Experience developing baseline, update, recovery, and as-built schedules.
  • Ability to perform Time Impact Analysis (TIA) and create a TIA report
  • Familiarity with forensic schedule analysis techniques.
  • Understanding of construction sequencing for highways, bridges, utilities, drainage, paving, earthwork, and structures.
  • Knowledge of resource loading and schedule optimization.
  • Ability to interpret construction drawings, specifications, and contract documents.
  • Experience with scheduling software integrations and reporting tools is preferred.
  • Capable of evaluating multiple schedule scenarios and forecasting project completion.
  • Ability to prepare professional schedule narratives and reports.
  • Ability to manage multiple projects simultaneously.
  • Strong time management and prioritization skills.
  • Ability to work independently with minimal supervision.
  • Excellent documentation and record-keeping practices.

Preferred Qualifications
  • Bachelor's degree in Civil Engineering, Construction Management, Engineering Technology, or a related field.
  • 5+ years of mid-level scheduling experience in heavy civil construction 
  • Experience on TXDOT, municipal, DOT, or federal transportation projects preferred.
  • Experience preparing or reviewing Time Impact Analyses (TIA).
  • Understanding of schedule specifications for public infrastructure projects.
  • Familiarity with production tracking and earned value concepts.
  • PSP (Planning & Scheduling Professional) certification is preferred but not required

 

Ragle Inc. Terms and Conditions

By providing your mobile number, you agree to receive text messages from Ragle Inc. regarding job opportunities, application updates, interview scheduling, and other recruiting-related communications.

You can cancel the SMS service at any time by texting STOP. After you send STOP, you will receive confirmation that you have been unsubscribed and will no longer receive SMS messages from us.

For assistance, reply HELP or contact us at recruitingtx@ragleinc.com.

Carriers are not liable for delayed or undelivered messages.

Message and data rates may apply. Message frequency may vary based on recruiting activity and application status.

For information about how we collect and use your information, please review our Privacy Policy: Ragle Inc. Privacy Policy

Privacy Policy: We collect your mobile number and related opt-in data for the delivery of SMS messages. Your mobile opt-in data and consent will not be shared with third parties or affiliates for marketing or promotional purposes.

Share

Apply for this position

Required*
We've received your resume. Click here to update it.
Attach resume as .pdf, .doc, .docx, .odt, .txt, or .rtf (limit 5MB) or Paste resume

Paste your resume here or Attach resume file

To comply with government Equal Employment Opportunity and/or Affirmative Action reporting regulations, we are requesting (but NOT requiring) that you enter this personal data. This information will not be used in connection with any employment decisions, and will be used solely as permitted by state and federal law. Your voluntary cooperation would be appreciated. Learn more.

Invitation for Job Applicants to Self-Identify as a U.S. Veteran
  • A “disabled veteran” is one of the following:
    • a veteran of the U.S. military, ground, naval or air service who is entitled to compensation (or who but for the receipt of military retired pay would be entitled to compensation) under laws administered by the Secretary of Veterans Affairs; or
    • a person who was discharged or released from active duty because of a service-connected disability.
  • A “recently separated veteran” means any veteran during the three-year period beginning on the date of such veteran's discharge or release from active duty in the U.S. military, ground, naval, or air service.
  • An “active duty wartime or campaign badge veteran” means a veteran who served on active duty in the U.S. military, ground, naval or air service during a war, or in a campaign or expedition for which a campaign badge has been authorized under the laws administered by the Department of Defense.
  • An “Armed forces service medal veteran” means a veteran who, while serving on active duty in the U.S. military, ground, naval or air service, participated in a United States military operation for which an Armed Forces service medal was awarded pursuant to Executive Order 12985.
Veteran status



Voluntary Self-Identification of Disability
Voluntary Self-Identification of Disability Form CC-305
OMB Control Number 1250-0005
Expires 07/31/2029
Why are you being asked to complete this form?

We are a federal contractor or subcontractor. The law requires us to provide equal employment opportunity to qualified people with disabilities. We have a goal of having at least 7% of our workers as people with disabilities. The law says we must measure our progress towards this goal. To do this, we must ask applicants and employees if they have a disability or have ever had one. People can become disabled, so we need to ask this question at least every five years.

Completing this form is voluntary, and we hope that you will choose to do so. Your answer is confidential. No one who makes hiring decisions will see it. Your decision to complete the form and your answer will not harm you in any way. If you want to learn more about the law or this form, visit the U.S. Department of Labor’s Office of Federal Contract Compliance Programs (OFCCP) website at www.dol.gov/ofccp.

How do you know if you have a disability?

A disability is a condition that substantially limits one or more of your “major life activities.” If you have or have ever had such a condition, you are a person with a disability. Disabilities include, but are not limited to:

  • Alcohol or other substance use disorder (not currently using drugs illegally)
  • Autoimmune disorder, for example, lupus, fibromyalgia, rheumatoid arthritis, HIV/AIDS
  • Blind or low vision
  • Cancer (past or present)
  • Cardiovascular or heart disease
  • Celiac disease
  • Cerebral palsy
  • Deaf or serious difficulty hearing
  • Diabetes
  • Disfigurement, for example, disfigurement caused by burns, wounds, accidents, or congenital disorders
  • Epilepsy or other seizure disorder
  • Gastrointestinal disorders, for example, Crohn's Disease, irritable bowel syndrome
  • Intellectual or developmental disability
  • Mental health conditions, for example, depression, bipolar disorder, anxiety disorder, schizophrenia, PTSD
  • Missing limbs or partially missing limbs
  • Mobility impairment, benefiting from the use of a wheelchair, scooter, walker, leg brace(s) and/or other supports
  • Nervous system condition, for example, migraine headaches, Parkinson’s disease, multiple sclerosis (MS)
  • Neurodivergence, for example, attention-deficit/hyperactivity disorder (ADHD), autism spectrum disorder, dyslexia, dyspraxia, other learning disabilities
  • Partial or complete paralysis (any cause)
  • Pulmonary or respiratory conditions, for example, tuberculosis, asthma, emphysema
  • Short stature (dwarfism)
  • Traumatic brain injury
Please check one of the boxes below:

PUBLIC BURDEN STATEMENT: According to the Paperwork Reduction Act of 1995 no persons are required to respond to a collection of information unless such collection displays a valid OMB control number. This survey should take about 5 minutes to complete.

You must enter your name and date
Human Check*